Posts

Showing posts with the label LOD 300 vs 350 vs 400 in MEP BIM

MEP BIM LOD 300 vs 350 vs 400: A Contractor's Guide

Image
MEP subcontractors lose money when the model they receive does not match the model they priced. The BEP promises one level, and the GC expects another. The detailing hours in between then land on the subcontractor's budget. An FMI study with PlanGrid tied 48% of US rework to poor project data and miscommunication. Most of that confusion traces back to three numbers in the contract. Contractors who understand LOD 300 vs 350 vs 400 before signing can price the real scope. Each level moves a different share of work from the engineer to the contractor. Why LOD Confusion Hits MEP Contractors First Contract language decides who pays for detail that nobody has modeled yet. A line like "BIM coordination per LOD 300/400" sounds like one scope. In practice, it covers two scopes with very different costs. GCs ask for shop-ready output, but the design model they hand over is LOD 300. Someone has to close that gap, and that someone is usually the subcontractor. Closing it mean...