Navisworks vs. ACC: Clash Detection Workflow
Most MEP clashes reach the field because teams review models that are already out of date. A duct moves on Tuesday, and Thursday's report still shows the old route. Construction leaders surveyed by FMI and PlanGrid tied 48% of US rework to poor project data and miscommunication. FMI put that bill at $31.3 billion in 2018 alone.
That gap puts the
tool choice in a new light. The Navisworks vs ACC clash detection question is
no longer just about finding clashes. It is also about how fast teams share
them and who acts on them.
Why Clash Detection
Moved from the Desktop to the Cloud
For years,
coordination ran on a weekly loop. A BIM coordinator collected models, appended
them in Navisworks, ran tests and exported a report. The report was thorough,
but designers kept modeling while the coordinator built it. So each meeting
reviewed last week's building. Anyone without Navisworks had only that static
report to go on.
Cloud-Based BIM
Coordination changed that timing. Designers publish models to a shared cloud
space, and ACC lets every reviewer open the clashes there. That shift helps
designers as much as reviewers. In a mechanical
BIM modeling workflow, engineers
can spot plumbing or structural changes before the weekly meeting.
Teams who weighed
BIM 360 model coordination vs Navisworks years ago will recognize this split.
BIM Collaborate Pro, which carries ACC Model Coordination, replaced BIM 360
Design. The cloud side has grown since then, but so has the gap in what each
tool does well.
What Navisworks
Manage Still Does Best
Navisworks gives
coordinators control that browser tools can't match. Coordinators build tests
in Clash Detective using search sets, which work like saved filters. A filter
for all chilled water pipes picks up new pipes each time the model updates.
That control pays
off on dense, detailed jobs:
Clearance tests: Coordinators check
maintenance gaps, not only physical overlaps.
Heavy files: The desktop handles multi-gigabyte models and
point cloud scans.
Clash grouping: Coordinators bundle hundreds of related pipe
hits into one item.
The cost is
hardware and ownership. Navisworks needs a strong Windows workstation and one
person who keeps the files current. If that person falls behind, the whole team
reviews stale models.
Where ACC Model
Coordination Speeds Teams Up
ACC asks for almost
no setup. A designer publishes a Revit, DWG, IFC or NWC model. ACC then lets
reviewers open fresh clash results in a browser. Reviewers click a cell in the
clash matrix, view the clash in 3D and assign an issue.
That simplicity
lets project managers and superintendents join cloud clash detection workflows
without learning Navisworks. Designers then see each issue pinned to the exact
element in Revit.
The limits show up
on complex jobs. ACC lets teams view RCS point clouds but can't clash against
them. Many non-Autodesk formats also load for viewing only. Its filters also
can't match multi-rule search sets, so coordinators sort through more noise.
How a Combined
Navisworks and ACC Workflow Runs
Since each tool
covers the other's gaps, experienced teams stop choosing and run both. Autodesk
built the bridge for exactly this setup. The Navisworks Coordination Issues
Add-in lets BIM managers open ACC models inside Navisworks. A typical loop runs
like this:
Designers publish Revit models to the ACC coordination space.
Project managers use ACC's automatic matrix for early, broad reviews.
The BIM manager runs search set and clearance tests in Navisworks.
The BIM manager turns grouped clashes into ACC issues for the right
designers.
When a designer
updates an issue, the matching clash status in Navisworks updates too. Nobody
downloads and appends files by hand anymore. Teams who clash only in Navisworks
can even switch off ACC's automatic clash for that space. That keeps one shared
issue list for the whole project. A clear MEP
coordination process depends on
that kind of ownership, whichever tool finds the clash.
Choosing the Right
Clash Workflow for Your Project
Project complexity
and team maturity decide which tool leads. Here is a quick way to sort your
next job:
ACC alone is enough: A standard commercial
build where most consultants model in Revit.
Navisworks is non-negotiable: Hospitals, data
centers and industrial plants with strict clearance rules.
Navisworks also leads: Jobs where crews
check fabricated spools against point cloud scans.
Most real projects
fall between those cases. The safest setup lets ACC handle visibility and lets
Navisworks handle precision.
Conclusion
The Navisworks vs
ACC clash detection debate ends with a pairing, not a winner. Navisworks gives
coordinators fabrication-level precision, and ACC gives the whole team one
current list of open issues. Teams that use both catch problems in the model
instead of on site. Firms short on in-house coordinators can bring in MEP
coordination services to run the
Navisworks side.
Stop
reviewing last models & Get the full hybrid workflow and
feature matrix in the complete blog